Land area
1. The kiln needs a site of 162*162 meters, which is 26,244 square meters.
2. The installation of machinery and equipment requires 20*40 meters
3. Raw material storage: 10,000 square meters
4. Finished product stacking: it can be stacked in the four corners of the site.
Previous Case:
9.38*150m Rotary Tunnel Kiln project
(220*115*75 mm )with a capacity of 150000 pcs / day
Construction period: 3-4 months
Rotary tunnel kiln specification
NO. | I | Specification | Remark |
1 | Kiln width | 9.38m | Distance between two rails |
2 | Kiln length | 150m | |
3 | Rail diameter | 150m | Outside rail |
4 | Inside height | 1.6m | |
5 | Stacking floors | 14 floors | |
6 | Daily capacity | 150000 | 9*4*3inch |
7 | Rate of final products | ≥99% | |
8 | Firing period | 42 hours | |
9 | Firing temperature | 850--1050ºC | |
10 | Stacking way | Robot stacking | |
11 | Extrusion pressure | 4.0MPa | |
12 | Extruder vacuum degree | ≤-0.092 MPa | |
13 | Clay shrinkage | ≤2% | |
14 | Clay plasticity | 7-15 | |
15 | Clay moisture | 15-18% |
Working time | Raw material handling |
Green brick forming |
Firing Tunnel kiln |
Fired brick stacking |
Per year (days) | 300 | 300 | 300 | 300 |
Per week (days) | 7 | 7 | 7 | 7 |
Shift/day | 1 | 1 | 2 | 1 |
Hours/shift | 8 | 8 | 12 | 10 |
Working time (hrs) /day | 8 | 8 | 24 | 10 |
Position | 1st Shift | 2nd Shift | Total(people) |
Raw material handling | 3 | 0 | 3 |
Green brick forming and robot | 5 | 0 | 5 |
Drying & Firing& | 1 | 1 | 2 |
Electrician class | 1 | 0 | 1 |
fired brick unloading | 10 | 0 | 10 |
Production subsidiary | 5 | ||
Production management | 5 | ||
Total | 31 people |
Liaoning Jinrong Machinery Import and Export Co., Ltd. is a company with its own import and export rights, and is a large group company integrating industry and trade. The registered capital of the company is RMB 180 million. The company includes metallurgical equipment manufacturing company, electric furnace equipment manufacturing company, electrical equipment manufacturing branch, mechanical processing branch and metallurgical design and research Institute.
Our company can undertake all kinds of metallurgical equipment design, manufacturing, installation, commissioning, trial production turnkey project. Our company can provide mining machinery and equipment, ironmaking blast furnace, sintering machine, coke oven, converter, electric arc furnace, ladle refining furnace, continuous casting equipment, steel rolling furnace, steel rolling production line, steel structure plant and crane and other metallurgical equipment and metallurgical machinery. Various other types of mechanical equipment are also available.
Our company is the direct agent of Anshan Steel, Bensteel, Fusteel and other large steel mills, the variety of steel is complete: pipe, plate, profile, wire and so on are in stock. If the special specifications, materials and other requirements, we can organize the order to purchase, schedule production and rolling, to ensure supply.
Our company has a history of 30 years, and now has established friendly contacts with more than 120 countries and regions and carried out various aspects of cooperation. We welcome customers from all over the world to visit our company.
Location :1-51-901-3041, Floor 9, Jiangsu Building, Qianyuan Emerging Market, Tiexi District, Anshan City, Liaoning Province
Total Number of Staffs | 585 | |||
Total Number of Managers | 40 | |||
Total Number of Technical Staffs | 160 | |||
Total Number of QC Staffs | 15 | |||
Total Number of workers | 310 | |||
Total Number of other staffs | 60 | |||
Contact person | Mr .Su | Position | president |