Output: | Process 50-100 Tons of Raw Materials Per Day |
---|---|
Process 50-100 Tons of Raw Materials Per: | 24 Cubic Meters |
Beet Pump Lift: | Beet Pump Lift |
Suppliers with verified business licenses
No | Name | Unit | Qty | Total price(USD) | Remark |
1 | Belt weeder | set | 1 | 18,680,000 | Implement Chinese standards |
2 | Double head stone remover | set | 1 | ||
3 | 20m head beet pump | set | 1 | ||
4 | 24 m3 cleaning machine | set | 1 | ||
5 | Beet hoist (17m) | set | 1 | ||
6 | Tail root catcher | set | 1 | ||
7 | Flat plate cutting machine | set | 1 | ||
8 | Beet extractor | set | 1 | ||
9 | Combustion furnace | set | 1 | ||
10 | Waste dross dryer | set | 1 | ||
11 | cyclone separator | set | 1 | ||
12 | Whole knife machine | set | 1 | ||
13 | Extractive juice remover | set | 1 | ||
14 | Combined effect evaporator | set | 2 | ||
15 | Sugar crystallizer | set | 2 | ||
16 | Heater | set | 2 | ||
17 | Sugar belt | set | 1 | ||
18 | Water ring vacuum pump (55KW) | set | 1 | ||
19 | 20 cubic sugar tanks | set | 1 | ||
20 | 20 cubic crystallizer | set | 1 | ||
Total price:USD18,687,500(Excluding spare parts, excluding the cost of wearing parts) | |||||
Note: 1. The spreader, installation tools and consumables (oxygen, acetylene, welding rod) required for on-site equipment installation shall be provided by Party A free of charge; 2. The board and lodging of on-site construction personnel shall be provided by Party A free of charge, and each installer shall provide daily subsidies The cost is 200 USD/person/day; 3. The electrical system does not include cable laying, cable trench digging, cable laying other than the main equipment, and electric cabinet foundation; 4. Party A shall prepare and install the other parts outside the scope of the quotation. |